Minimum Wage in Central Sphere w.e.f October 1, 2014 to March 31, 2015

Minimum Wage in India, Central Sphere Minimum Wage from October 1, 2014. Minimum Wage for Agriculture, Construction, Industrial Units
Scheduled Employment Area Category of workers
Un-Skilled Semi-Skilled/Unskilled Supervisory Skilled/Clerical Highly Skilled
Basic Min Wage V.D.A. Total Min Wage Basic Min Wage V.D.A. Total Min Wage Basic Min Wage V.D.A. Total Min Wage Basic Min Wage V.D.A. Total Min Wage
( In Rupees Per Day ) ( In Rupees Per Day ) ( In Rupees Per Day ) ( In Rupees Per Day )
Agriculture A 114 103 217 125 112 237 137 121 258 153 133 286
B 104 93 197 116 103 237 125 112 237 141 124 265
C 102 93 195 107 93 237 115 103 218 125 112 237
Industrial Worker (employees employed in loading and unloading in 1)goods sheda, parcel offices of railways; 2) other goodssheds, godowns, warehouses; 3) docks and ports A 180 152 332 80 115 89 204 125 97 222
B 150 126 276 0
C 120 102 222 0
Industrial Workers employed in Gypsum Mines, Barytes Mines, Mauxite Mines, Manganese Mines, China Clay Mines, Kyanite Mines, Copper Mines, Clay Mines, Magnesite Mines, White Clay Mines, Stone Mines, Steatite Mines, Ochre Mines, Asbestos Mines, Fire Clay Mines, Chromite Mines, Quartzite Mines, Quartz Mines, Silica Mines, Graphite Mines, Felspar Mines, Laterite Mines, Dolomite Mines, Red Oxide Mines, Wolfram Mines, Iron Ore Mines, Granite Mines, Rock Phosphate Mines, Hematite Mines, Marble and Calcite Mines, Uranium Mines, Mica Mines, Lignite Mines, Gravel Mines, Slate Mines, Magnetite Mine For work above ground 120 102 222 150 126 276 180 152 332 210 176 386
For work below ground 150 126 276 180 152 332 210 176 386 240 199 439
Sweeping and Cleaning A 180 152 332
B 150 126 276
C 120 102 222
Watch and Ward (without arms) A 200 167 367
B 170 142 312
C 140 119 259
Watch and Ward (with arms) A 220 184 404
B 200 167 367
C 170 142 312
Construction or maintenance of roads or runways in buliding operations including laying down underground electric,wireless, radio, television, telephone, telegraph and overseas communication cables and similar other underground cabling work, electric lines, water supply lines and sewerage pipe lines A 180 152 332 200 167 367 220 184 404 240 199 439
B 150 126 276 170 142 312 200 167 367 220 184 404
C 120 102 222 140 119 259 170 142 312 200 167 367

 

Workers engaged in Stone Mines for Stone Breaking and Stone Crushing Category Daily Basic Wage Daily VDA Total Daily Minimum Wages
1. Excavation & removal of over burden with 50 m lead/1.5 meters lift
(a) Soft Soil 103.53 117.87 221.4
(b) Soft Soil with Rock 157.78 176.79 334.57
(c ) Rock 208.09 235.77 443.86
2.  Removal and Staking of rejected stones with 50 meters lead 1.5 meters lift 82.44 94.29 176.73
3. Stone Breaking or Stone Crushing for the stone size Daily Basic Wage Daily VDA Total Daily Minimum Wages
(a) 1.0 inch to 1.5 inches 646.44 730.91 1377.35
(b) Above 1.5 inches to 3.0 inches 552.12 624.8 1176.92
(c ) Above 3.0 inches to 5.0 inches 322.69 365.44 688.13
(d) Above 5.0 inches 264.47 300.61 565.08
Loading...